Manage projects

Project overview

Anti Malaria Program

This magnificent modular office of 240m2, was build for the Anti Malaria Program and is situated in Paramaribo North.

Cozy home

This cozy home was build in the rural areas of Suriname and exists of 1 bedroom, 1 bathroom & lavatory and one kitchen and dining…

Elevated office

This elevated office of 12×2.4meters was build on top of a 40ft sea container in Paramaribo.

Maintenance cabin

This cabin was build with roll up doors and a checkered plate floor to serve as an excelent maintence cabin.

Office

An office of 28.8 square meters with sanitary goods (lavatory, sink and shower) and also a small kitchenette.

Office

This L-shaped office with secondary roof and guardhouse.

Office

Office space in Paramaribo.

Offices for export

These offces were completely prefabricated in our factory and shipped as packages to Sint Lucia.

Small mencamp for maintenance crew

A small mencamp for a maintenace crew in the interior of Suriname.

St. Maarten

Precamp manufactured and delivered the headquarters of the Marine Corps detachment in the cargo terminal of the harbor in Point Blanche in St.Maarten. This building…

State Oil Refinery Project

In June 2011 Staatsolie, Suriname’s state-owned oil company, signed an agreement with Saipem S.p.A for the engineering, procurement and construction of its new oil refinery…

Surgold – Electrical cabin

This cabin was especially custom made designed for the tons of heavy electrical equipment, which must operate safely in one of our cabins at Surgold.…

Surgold – Lab office

On August 17, 2015 Precamp started to assemble the third building at Surgold assigned as Lab office. The dimentions of this building are 64.5×17 meters…

Surgold – Mill Office

On May 6, 2015 Precamp started to assemble one of the buildings at Surgold assigned as Mill office. The dimensions of this building are 13.76×79.54…

Surgold – Mine Office

On the 26th of May Precamp started with the second building for the Surgold Merian Project. The building has a total of 1185 square meters and an…

Surgold Poject

In 2012 Precamp SA NV manufactured and delivered a 250 mencamp on behalf of Surgold at Merian Kondre, approximately 80 km south of Moengo in…

Trinidad & Tobago

For the University of Trinidad and Tobago, Precamp was awarded to design and built a pre-fabricated building for classrooms and teaching purposes at the University…

Troy Resources Guyana

In 2014 Precamp delivered a men camp for approximately 300 men to the Gold Mining Company Troy Resources. The men camp consist of sleepers for…