Project overview
Anti Malaria Program
This magnificent modular office of 240m2, was build for the Anti Malaria Program and is situated in Paramaribo North.
Cozy home
This cozy home was build in the rural areas of Suriname and exists of 1 bedroom, 1 bathroom & lavatory and one kitchen and dining…
Elevated office
This elevated office of 12×2.4meters was build on top of a 40ft sea container in Paramaribo.
Maintenance cabin
This cabin was build with roll up doors and a checkered plate floor to serve as an excelent maintence cabin.
Office
An office of 28.8 square meters with sanitary goods (lavatory, sink and shower) and also a small kitchenette.
Offices for export
These offces were completely prefabricated in our factory and shipped as packages to Sint Lucia.
Small mencamp for maintenance crew
A small mencamp for a maintenace crew in the interior of Suriname.
St. Maarten
Precamp manufactured and delivered the headquarters of the Marine Corps detachment in the cargo terminal of the harbor in Point Blanche in St.Maarten. This building…
State Oil Refinery Project
In June 2011 Staatsolie, Suriname’s state-owned oil company, signed an agreement with Saipem S.p.A for the engineering, procurement and construction of its new oil refinery…
Surgold – Electrical cabin
This cabin was especially custom made designed for the tons of heavy electrical equipment, which must operate safely in one of our cabins at Surgold.…
Surgold – Lab office
On August 17, 2015 Precamp started to assemble the third building at Surgold assigned as Lab office. The dimentions of this building are 64.5×17 meters…
Surgold – Mill Office
On May 6, 2015 Precamp started to assemble one of the buildings at Surgold assigned as Mill office. The dimensions of this building are 13.76×79.54…
Surgold – Mine Office
On the 26th of May Precamp started with the second building for the Surgold Merian Project. The building has a total of 1185 square meters and an…
Surgold Poject
In 2012 Precamp SA NV manufactured and delivered a 250 mencamp on behalf of Surgold at Merian Kondre, approximately 80 km south of Moengo in…
Trinidad & Tobago
For the University of Trinidad and Tobago, Precamp was awarded to design and built a pre-fabricated building for classrooms and teaching purposes at the University…
Troy Resources Guyana
In 2014 Precamp delivered a men camp for approximately 300 men to the Gold Mining Company Troy Resources. The men camp consist of sleepers for…