Welcome to our Prefab World

Precamp Type A Cabin

  • 1 External half glass door with bars 1045×2100 mm
  • 2 Sliding windows with bars 1045×1100 mm

Precamp Type B Cabin

  • 1 External half glass door with bars 1045×2100 mm
  • 2 Sliding windows with bars 1045×1100 mm

Precamp Type C Cabin

  • 1 External half glass door with bars 1045×2100 mm
  • 3 Sliding windows with bars 1045×1100 mm

Precamp Type D Cabin

  • 1 External half glass door with bars 845×2100 mm
  • 3 Sliding windows with bars 1045×1100 mm

Other products

Precamp Type E Cabin

  • 1 External half glass door with bars 845×2100 mm
  • 2 Sliding windows windows with bars 1045×1100 mm

view details >

Light Gauge Steel Guardhouse

A new type of guardhouse manufactured from light gauge steel. It is a turnkey solution and construction time is 1 week.

view details >

Precamp budget type

The budget cabin type is a less expensive type of the Precamp type A cabin and …

view details >

Does your cabin or building need a fix?
Our customer service is ready to solve your problems.

Our building process

Design & build components

The process starts with a telephone conversation or a meeting at our office or email. We review your needs, budget, location and any other information that is relevant for us to provide you with a cost estimate. Precamp SA NV can provide a complete service on turnkey basis because of our experience and knowledge in designing, engineering and construction of temporary or permanent accommodations.

Transport to destination

Transportation depends on the location and can be by truck, ship, aircraft cargo etc. Locally transport is very easy if the location is accessible for a hyab truck. If not, packages in standard size are made and delivered. A specialized crew will erect and coordinate the installation. For overseas production are the materials packed in packages according to the international packaging rules.

Reassemble components

In our fully equipped factory, the cabins and modular buildings are prefabricated, usually in standard sections that can easily be transported and assembled. Onsite construction can start after inspection. Execution will be in accordance with the regulations.