On the 26th of May Precamp started with the second building for the Surgold Merian Project. The building has a total of 1185 square meters and an inner height of 3 meters. The same construction method as the Mill Office is used. As much as possible is prefabricated in the Precamp factory and transported to site. The buiding is also constructed of: