On May 6, 2015 Precamp started to assemble one of the buildings at Surgold assigned as Mill office. The dimensions of this building are 13.76×79.54 meters with an inner height of 3 meters. All materials were prefabricated at Precamp and then transported to the site for easy and fast erection. The building is constructed of:
- A Light Gauge Steel (LGS) frame structure that is anchored on a concrete foundation
- Roof cladding consisting of trapezium roof sheets
- Trapezium sheets for the exterior wall cladding with rockwool insulation
- Interior walls constructed of light gauge steel profiles with rockwool insulation and covered with 12.7 mm cement board
- Suspended Ceiling